Brand | Kaizen Steel Building |
The Pre Engineered Buildings are about 20-30% lighter than the conventional buildings. As the Structural members of the conventional buildings are Hot Rolled, which makes the building heavy-weight. The Design of the PEB structures is efficient due to its Integral framing system. The PEB has two purposes: to determine whether or not you are fit for duty, and ii you are unfit, to determine what disability Compensation you are entitled to receive.
- How long is the PEB process?
Once the qualifying conditions are rated, the case is returned to the PEB, and the PEB publishes its decision. This stage of the PEB Process usually lasts between 2 – 3 months. Depending on the complexity of the case, however, it could be shorter or longer.
- What grade of steel is used in PEB?
MATERIAL SPECIFICATION
MATERIAL | STEEL GRADE / MATERIAL SPECIFICATIONS |
---|---|
Built-up members (Steel plates) | SS400, Q235, ASTM A36, S235 |
Shaped steel (Hot-rolled members) | Q345, ASTM A572 Gr. 50, SM490/SS490, S355 |
Shaped steel (Hot-rolled members) | SS400 (JIS), ASTM A-36 (or equivalent) |
Cold rolled members | JIS G3112, ASTM G340/G450 |
To be first to post questions.
Please Login to comment