0
0

SQFTP-6375 Peb Warehouse Shed

Peb Warehouse Shed

SQFTP-6375

Steel buildings system that was created and manufactured at a factory before being brought to the location for assembly.

₹ 120 /sqft

Want to buy in bulk?

We will send you PO detail on your registered email.
Contact seller now.

Product Specifications

Brand Kaizen Steel Building

Product Information

The Pre Engineered Buildings are about 20-30% lighter than the conventional buildings. As the Structural members of the conventional buildings are Hot Rolled, which makes the building heavy-weight. The Design of the PEB structures is efficient due to its Integral framing system. The PEB has two purposes: to determine whether or not you are fit for duty, and ii you are unfit, to determine what disability Compensation you are entitled to receive.

How long is the PEB process?

Once the qualifying conditions are rated, the case is returned to the PEB, and the PEB publishes its decision. This stage of the PEB Process usually lasts between 2 – 3 months. Depending on the complexity of the case, however, it could be shorter or longer.

- What grade of steel is used in PEB?


MATERIAL SPECIFICATION 

MATERIALSTEEL GRADE / MATERIAL SPECIFICATIONS
Built-up members (Steel plates)SS400, Q235, ASTM A36, S235
Shaped steel (Hot-rolled members)Q345, ASTM A572 Gr. 50, SM490/SS490, S355
Shaped steel (Hot-rolled members)SS400 (JIS), ASTM A-36 (or equivalent)
Cold rolled members

JIS G3112, ASTM G340/G450


Video

Brochure

Rating & Reviews

0 Comments
Questions & Answers

To be first to post questions.


Whatsapp Icon Whatsapp